Delta-Hedging

Delta-Hedging

Delta-Hedging of thermal power plants

The market offering of thermal power generation to the forward market is becoming more and more difficult due to the decline of forward prices. In the past, when peak products were traded it was assumed that the thermal power plants would most likely remain open in peak hours. Due to today’s uncertainties in dark/spark spreads, however, standstills in peak hours has to be considered.

The optimal hold positions in each forward product with regard to uncertainties in generation spreads is the delta position. The delta position is based on stochastic optimization and is determined with a sufficiently high number of correlated and cointegrated scenarios of electricity, fuel and CO2 prices:

  • In the first instance, the delta positions are calculated for each hour of the trading horizon.
  • In the secound instance, they are decomposed with a special algorithm into real forward products.

With a delta-hedged forward portfolio, changes in spreads lead to value-neutral changes in the forward product positions.

DT.Plantval is in use with proven success for the company Trianel GmbH in Aachen as well as for several Austrian energy companies.

OFFICE
MUNICH

Konrad-Zuse-Platz 8
D-81829 München

Tel.: +49 89 207042 284
Fax: +49 89 207042 288

office@dtrees.com

OFFICE
ST. GALLEN

Kornhausstrasse 26
CH-9000 St. Gallen

Tel.: +41 71 313 05 55
Fax: +41 71 313 05 01

office@dtrees.com

TOP NEWS

Decision Trees freut sich darauf Sie ab 10. Februar 2026 an unserem Stand auf der E-World in Essen begrüssen zu dürfen.

© Decision Trees GmbH – All rights reserved

dtrees-logo-footer
Nach oben